Preskočiť na hlavný obsah
Login sa

DRG system update for 2024 - second phase

29.09.2023

The CKS has prepared the second phase of the upgrade of the SK-DRG-2023 system to the SK-DRG-2024 system.

As of 28.9.2023 the following documents were issued with effect from 1.1.2024:

Also updated batch 274s Data interface for merging extramural and intramural health care